Drill2Frac uses the latest
Most applications can be delivered in a matter of days, and in some cases as little as 24 hours. The applications include:
Modify Existing Completion Design
Placement of perforations in rock with properties more advantageous to well distributed fracture initiation within each stage
Provide comparisons between multiple configurations
Engineered Diversion
Leverage rock heterogeneity to design effective diverter programs
Greatly increase diverter effectiveness and fluid/proppant distribution compared to trial-and-error methods
Protection and Refrac Analysis
Evaluate fluid and proppant distribution in existing production wells to assess re-stimulation potential
No requirement to acquire new data
Design for protection fracs